[Gmsh] RE Merging with same indicator - Merging the nodes
jean pierre aubry
jeanpierre at lamachine.fr
Thu Apr 17 15:42:54 CEST 2014
hello
did you try Coherence after the merging
when i use Merge
i set the first file with entity numer from 1 to say 1000 in the first
file
and from 10000 to 11000 in the second then i do Coherence
this insures nodes with same coordinates are merged
elements with the same geometrical position swould be merged anyway,
though i never tried it
however i am unable to run your files
for examples in DOMAINE_PIEZO
for me this sequence is not a valid Gmsh set of commands
For i In {0:5:1} //25
points créés Point(sum)={List[i],List[i],0,lc};
........
--
jean pierre aubry
33 688 670 795